SUMMARY
15 years
experience planning and managing construction project schedules and tracking
costs. Software experience includes Primavera Project Planner (P3), P3e, P5,
P6, SureTrak and Prism G2. 20 years of experience managing materials and
production planning, scheduling and forecasting in a manufacturing
environment. PROFESSIONAL EXPERIENCE
AECOM \ URS
\ Washington Group International – Schedule
Analyst (January 2014 to Present) Construction and start-up scheduler for new
FGD construction project at Dynegy Power Plant in Newton, IL. Manage field
quantity and cost data in PRISM G2. Schedule
Analyst (January 2013 to December 2013) Construction and turnover package
scheduler for new OXYChem Chlorine Plant construction in New Johnsonville,
TN. Assisted Cost Analyst in PRISM as needed. Schedule
Analyst (July 2011 to December 2013) Construction and start-up scheduler for
new FGD construction project at Ameren Power Plant in Newton, IL. Schedule
Analyst (November 2005 to July 2011) Scheduled resource loaded capital
projects and O&M work to be performed by Washington Group and/or Detroit
Edison labor at Detroit Edison's Power Plants during planned periodic outages
/ turn-arounds and tracked costs incurred by Washington Group under an
alliance agreement. Also performed forced outage scheduling as needed.
Tracked costs and prepared budgetary and bid package estimates. Projects
ranged in size from $10K to $30 Million. Casey
Industrial, Inc. Scheduler /
Planner (March 2004 to November 2005) Scheduler for replacement of
Electrostatic Precipitators at Cinergy power plant in Cayuga, Indiana.
Planned and scheduled construction activities with Primavera SureTrak and
coordinated with primary contractor. Managed cost data, skilled trades’
productivity data, prepared subcontractor bid packages and sourced
subcontractors. SG
Construction Services- Scheduler /
Planner (April 2003 to January 2004) Member of the Construction Effectiveness
program at General Motors Engine Plant in Tonawanda, New York. Planned and
scheduled construction activities with Primavera P3e to support
reorganization of the plant to accommodate installation of a new engine
production line. Full utilization of the UAW skilled trades determined the
workforce availability. Provided assistance with estimating. Washington
Group International - Readiness /
Scheduling Manager (August 2000 to February 2003) Ford Duratec Engine Plant
Renovation in Cleveland, Ohio. Directed the planning, scheduling and
coordination of the Cleveland Engine Plant #1 facility shutdown and
renovation schedule and the new equipment delivery and installation schedule
using Primavera P3 for Ford’s Powertrain Division. Developed a schedule from
the initial project plan with input from all disciplines that was resource
loaded and sequenced to allow for time and space constraints. Project
encompassed over $160 million in construction activities and installation of
$600 million in equipment. Field Support
– Contract Employee (June 2000 – August 2000) - General Motors’ GMT800
shutdown and startup for a product conversion at the facilities located in
Flint, MI. Planned a shutdown with Primavera Project Planner in which 1500
contractor employees replaced nearly the entire truck assembly line and
brought it back into production in 4 weeks. Also assisted
with project planning and scheduling for the GMT560 shutdown and
refurbishment program utilizing Primavera Project Planner at the General
Motors Truck Plant in Flint, MI. Whittman-Hart, Inc. - June 1999 to May 2000
Consultant for
the Package Software Solutions group. Primarily assisted clients in the
implementation of ERP software. Packages that were supported include
J.D.Edwards One World, J.B.A. System 21 and Symix SyteLine. Training included; J.D.Edwards One
World Manufacturing Expedition, J.B.A. Active Modeler and Primavera P3
Project Planning. Trendway
Corporation - 1979 to June 1999 Master
Scheduling Manager (March 1994 to June 1999) Principal responsibilities included;
Production planning, capacity planning, maintaining planning bills and
forecasts; training and supervising Schedulers and Production Control
personnel; and maintaining "Class A" service levels. Production
Control Supervisor (April 1986 to March 1994) Principal responsibilities
included; planning production sequences and capacity planning. Production
Supervisor in various areas (1979 to April 1986) EDUCATION
Grand Valley
State College Allendale,
MichiganBachelor of Business Administration Major:
Finance Additional Training
Scheduling
software experience includes Primavera Project Planner P3, P3e, P5, P6 and
SureTrak.
STS in
Construction (Safety Trained Supervisor) Certified Additional
Courses: Project
Controls and Change Management – WGI Scheduling
Fundamentals - WGI ISO 9000
Standards - MMTC Process
Re-engineering - Millennium Management Primavera P3
Training (601, 602, 603) OSHA 10 Hour
Safety Red Cross CPR
training |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||